Things are really moving along now! The original 1967 septic system had reached its natural end of life and the new, slightly bigger septic system has been installed by the very capable Evans and Lindsay McNab of Elm Enterprises. And after that, they graded the yard and filled in around the lovely new foundation. And the entire crawl space floor has been completed. A section of the original deck that was covered over by the new deck wasn't quite up to snuff. And all of that swimming has turned our golden retriever Holly into a very matted mess. That was all fixed up today by the talented groomers at Pawsitively Country Grooming in Renfrew. Holly seems very pleased with her new look (and feel) including her fashionable neck scarf. Looks like we need to tighten up her collar!
0 Comments
Leave a Reply. |
Bogie Project BlogThis blog is dedicated to the loving memory of Glen Brownlee (d. June 19, 2018), a master of cottage projects, who was so looking forward to following our first cottage project, which is underway on Calabogie Lake, ON Posts
Most recent is first Dock Finally Spring Custom Table Finishing Interior Trim Kitchen Completed Kitchen and Much More Painting Siding Drywall Odds and Ends Roof Windows and Doors Great Progress Inside & Out More Framing Walls Building! Big Storm Septic System & Grading Foundation Starting Over D Day Demolition Prep Lumber Jack & Lumber Jill By the Water Calabogie Lake Project ALL Posts Archives
July 2019
|