The drywall is now all up and the painstaking taping and sanding is underway. This is a big step forward on the inside as the rooms are all now well defined. Gavin and his drywalling team were hard at work during our recent visit. This is the view from the road side entry door towards the great room with the 2 sets of sliding doors looking out onto the deck and the lake. This is the small bedroom/sewing room. And one of the larger bedrooms has a lovely view onto the lake from these corner windows. Unfortunately the camera flash is reflected off the window and blocking the lake view. Hot water tank with the pressure tank for the well on the shelf above in the utility room. Winter like weather persists in the Ottawa Valley with ongoing snow cover. No ice yet on our section of the lake.
0 Comments
Leave a Reply. |
Bogie Project BlogThis blog is dedicated to the loving memory of Glen Brownlee (d. June 19, 2018), a master of cottage projects, who was so looking forward to following our first cottage project, which is underway on Calabogie Lake, ON Posts
Most recent is first Dock Finally Spring Custom Table Finishing Interior Trim Kitchen Completed Kitchen and Much More Painting Siding Drywall Odds and Ends Roof Windows and Doors Great Progress Inside & Out More Framing Walls Building! Big Storm Septic System & Grading Foundation Starting Over D Day Demolition Prep Lumber Jack & Lumber Jill By the Water Calabogie Lake Project ALL Posts Archives
July 2019
|