Kitchen and Much More

1/1/2019

1 Comment

 
Much has happened at our Calabogie Lake home over the last several weeks. I've fallen behind in my blogging due to Christmas preparations, and my recovery from my hernia surgery.

Hugh made many more trips to complete the painting after the excellent start on December 1-2. We selected the same grey/blue/green and yellow shades as in our house and we're very pleased with how that's turned out.

Electrical, plumbing, gas fireplace, and heating systems are now functional with the exception of the plumbing in the kitchen.

And Ken and Mark were enlisted one Saturday to move furniture. We are fortunate to be able to use some of the lovely hand crafted wood furniture, loveseat and chair that my cousin Carl Wolff had in his retirement home suite in Arnprior. Sadly Carl died on August 29 at the age of 81. The furniture has been in our garage since September and Hugh is keen to get his truck back inside.
Picture
Ken is spearheading the effort to construct a dining table from local ash. He and Hugh have been planing the boards in our garage. They're pictured here on the sawhorses awaiting gluing.
Picture
December 19th was an exciting day for me as the kitchen cabinet installation began.
Scaffolding was back that day for installation of the ceiling fan. 
Picture
Here are cabinet makers/installers Adam at left, and Shawn McLachlin at right. Shawn is the owner of SBC Kitchens (Sandy Beach Cabinetry) and we are thrilled with the entire design process, the results and the excellent service.
Picture
The appliances also arrived that day. Once again we dealt with Scheel Furniture and Applicances in Pakenham for another enjoyable shopping experience. There's something about a store that sells appliances, furniture, meat and cheese! And they deliver to Calabogie. We went with Frigidaire in the kitchen.
I enjoyed several relaxing hours of waiting in the living area that day enjoying the lovely view and knitting.
The cabinet installation was completed the next day and due to Christmas prep I had to patiently wait until Boxing Day to see the final result. Here's Tim configuring the fridge. I love the wine rack that Shawn suggested to fill the small space to the left of the window.
Picture
Mark, Meg, little Joanna, and I worked on assembling the bunk beds. Joanna did a great job of sorting the various sized screws.
Picture
Picture
Molly, Mark and Meg's Bernese Mountain dog, came along and enjoyed the action.
Picture
We returned on December 29th, this time with Amy and baby Sarah along. Joanna tried out the bottom bunk!
Picture
Picture
Hugh also arranged for 2 new king sized memory foam beds so we're well along the way to being ready for overnight stays.
Picture
Picture
Kitchen counters and sink are scheduled for next week.

The obvious missing piece is trim and interior doors. We selected those on December 21 at Bytown Lumber in Carleton Place. There will be a 4 week wait for the solid doors we selected since they're made to order at the factory. In the interim, Hugh secured a temporary door with frame from their clearance section for the bathroom. A bargain at $40! And we lucked into a great deal on the door hardware from the clearance shelf. It didn't take long for Hugh and Tim to install the door. 
Picture
Picture
I fear that the outdoor temporary shelter for the building supplies will remain until spring because the frame is now very solidly frozen into the ground! The lovely cedar shake accents were locally sourced by Hugh.
Picture
After celebrating a very merry Christmas we wish you a Happy New Year 2019!!
1 Comment
Wayne
1/2/2019 12:08:58 pm

Looking great. I particularly like the corner windows in the master bedroom.

Reply



Leave a Reply.

    Face Masks
    Merry Christmas 2019

    Bogie Project Blog

    This blog is dedicated to the loving memory of Glen Brownlee (d. June 19, 2018), a master of cottage projects, who was so looking forward to following our first cottage project, which is underway on Calabogie Lake, ON
    - Hugh & Janet Brownlee


    Posts
    Most recent is first
    Dock
    Finally Spring
    ​Custom Table
    Finishing
    Interior Trim
    Kitchen Completed
    Kitchen and Much More
    Painting
    Siding
    Drywall
    Odds and Ends
    Roof
    Windows and Doors
    Great Progress Inside & Out
    ​More Framing
    Walls
    Building!
    Big Storm
    Septic System & Grading
    Foundation
    Starting Over
    D Day
    Demolition Prep
    Lumber Jack & Lumber Jill
    By the Water
    Calabogie Lake Project
    ​
    ​
    ALL Posts 

    Archives

    July 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018


    Stuff
    ​Killarney pics

    RSS Feed

Site powered by Weebly. Managed by StormWeb, Canadian web hosting at its best.
  • Home
  • Price List
  • Breeding Stock
  • About
  • Contact
  • Bogie Project